For this project we already sat down with our client in the preparation phase. Together we looked for solutions to shorten construction time and reduce inventory at the building site to zero. The number of transport movements have been drastically reduced by cleverly combining freights.
The number of transport movements have been drastically reduced by cleverly combining freights. Pultrum picked up the materials from suppliers, after which they were combined at Pultrum for day production. In close cooperation with our customers planning, we deliver the necessary products with our transportable forklift. There are no unnecessary waiting times or disturbances due to the professional capabilities of our drivers.